To Be Announced!
Schedule TBA
Aerial shot of Tri County Speedway, Hudson, NC
In the event of a rain out during our races the following policy will be implemented. If the event is at the half way point, meaning we have ran half of the scheduled races then the race will be considered complete. Therefore, no raincheck will be issued. However, if the race hasn't reached the half way point then you will keep your ticket stub as a rain check to be admitted into the next scheduled weekly event. This does not apply to special events as they will have their own policies in place. The raincheck will only be honored if previous rain out stub is present and only for the next scheduled race. With this being said Tri County always tries to do everything in their power to dry the track and get the complete schedule in.
Tri County Speedway